Deadline · checked
How early should I mail a quilt for a show deadline?
Subtract transit and your own buffer from the window, then compare what is left with the shop's published processing range. A 28-day window, 3 days out, 3 days back and a 4-day margin leaves 18 days for processing. If the shop's documented range is 14–21 days, 18 days sits inside it and the plan works — provided you post on the day you worked from.
Next: Enter the need-by date, both transit legs, your buffer and the shop's published range. With no range it returns questions for the finisher. Run the deadline planner →
The sums, in order
- Days from today to the need-by date: 28.
- Less outbound transit: 3. Less return transit: 3. Less your own margin for binding, photographs or a show check-in: 4.
- Available for processing: 28 − 3 − 3 − 4 = 18 days.
- Latest safe post date: need-by minus the documented maximum processing days, minus return transit, minus your margin.
What shops publish to plan against
Cherry Apple Quilting says its turnaround is approximately 3–4 weeks depending on size. That is 21–28 days, so an 18-day processing window does not fit the upper half of that estimate, and the planner reports it as short rather than promising the date.
Modern Textiles publishes a usual turnaround of about two weeks with a $25 rush option. Two weeks is 14 days, which sits inside the 18-day window with four days to spare.
HeartSong Quilts, Comfort & Joy Quilting, Prairie Quilter and Harvest Moon Quilting publish no turnaround at all, so no date can be promised from their pages.
Why the buffer is yours, not the shop's
The shop's processing range ends when the quilt is finished, not when it is in your hands. The buffer absorbs a late parcel, a query about the backing, a holiday closure or a show that wants the quilt a day early for check-in.
Four days is a working default for a show. For a gift or a bed quilt, a two-day buffer is often enough.
The exception that changes the answer
A published estimate is not a dated queue position. Cherry Apple's 3–4 weeks could be measured weeks ago. Before you rely on any date, confirm the current wait in writing — and if the shop has no dated queue, the planner will hand you the questions to ask instead of a promise.
Next action
The matching tool: /tools/deadline-planner/.
Related decisions
Sources
- Cherry Apple Quilting: Turnaround and rush service · checked · "approximately 3-4 weeks right now", plus a $50 rush fee.
- Modern Textiles: Rates and turnaround · checked · "My usual turn around is 2 weeks", $25 rush to skip the line.
- APQS: Attacking scrappy backs · checked · Why the backing needs extra length on the frame, which is the step that delays a re-cut.
Evidence record
partial q10 — How early should a show quilt be mailed to a finisher?
Geography: United States; planning example uses a Brookings quilter posting to a South Dakota or Minnesota studio. · answer evidence: partial · source thread readable.
- Neither turnaround estimate carries a measurement date, so neither can be treated as a dated queue position.
- Transit days are the visitor's own assumption; no carrier API is called and no transit time is published by these shops.