Two quotes · US dollars
Longarm quote comparison and missing-cost checklist
Enter the same finishing scope for both options. Enter 0 only for a confirmed included or unnecessary charge. Leave an unconfirmed cost blank. If the smallest stitching charge is higher than the area-based figure, enter the minimum as base stitching once.
Confirm the work behind the numbers
Ask both finishers to quote the same top size, quilting density, preparation and finishing. Include any backing purchase under prep, and do not count a refundable deposit twice. Confirm pickup or return separately from the stitching completion date.